Back to case studies

Case studies


Mrs Allen, Sunderland


Project

We were asked by Mrs Allen to provide ramping equipment to the rear entrance of the property together with new balustrade rails. An Excellent system ramp was also laid at the landing area of the ramp to marry up the ramp with the existing garden paving. Gravel could not be used underneath the ramp due to the medical condition of one of the children so the underside of the ramp was fenced in. In addition rubber crumb was adopted as an alternative surface to the ramp which ensured the safety of the children.

Outcome

Mrs Allen’s children are now able to have access in and out of the property to the garden area.

Key Services

Onsite survey – accessing the needs of the children
Survey & technical drawing
Installation – ramp, associated groundwork’s and handrail.
Working within a target framework

Testimonial

Of all the companies we have dealt with over the last couple of years, to make all the necessary adaptations for both children, yours has been, by far, the best. Everyone I’ve spoken to either in person or over the phone have been exemplary. The work is to an excellent standard and because you listen to what is needed, it is perfect for our needs. Nothing needs to be altered of changed. Thank you, it is very much appreciated.

Thank You

Thank you so much for the beautiful ramp and safety railings you fitted in our back garden recently. We’re absolutely thrilled with them. You’ve given our daughter, Lucy, her independence. She can now access and play safely in the garden “under her own steam” for the first time. Thank you for your hard work, you’re amazing. (Mrs Jo Allen, Sunderland).