Project

We were asked by Durham County Council to provide ramping equipment to the front entrance of the property together with a new set of Upvc doors to enable level access to and from her front door. We were also asked to relocate radiator to a different wall to allow the new doors to be fitted. Concrete was also laid at the landing area of the ramp to marry up the ramp with the existing public footpath. Gravel and membrane were used underneath the ramp to act as a weed suppressant. A small section of the dwarf wall was removed to allow the installation to take place.

Outcome

Mrs Boxx is now able to be assisted in and out of her property.

Key Services

  • Onsite survey – accessing the needs of the client
  • Survey & technical drawing
  • Installation – door and associated works
  • Installation – ramp and associated groundwork’s
  • Working within a target framework

Testimonial

Overall level of service of office staff/surveyor/installation team 10+
We had a 5 Star service – Thanks
Lads were brilliant, courteous and on time
I’ve never known anything go so smoothly in all my life – service was excellent